Bahrain tender for supplying and commissioning of transformer oil analyzers
SUPPLYING AND COMMISSIONING OF TRANSFORMER OIL ANALYZERS: DISSOLVED GAS, FURAN & PASSIVATION CONTENTS (Electricity Transmission Directorate)
7. DOCUMENTATION
All the user manuals like operation, service and maintenance with all electronics circuit diagram for all accessories to be supplied in English.

The job description of operators and service engineers should be clearly spelt out. The documentary evidence of conformity of the goods to the tender documents may be in the form of literature, drawings & data, and shall consist of:
(a) A detailed description of the essential technical and performance characteristics of the analyzer

(b) a list giving full particulars, including available sources and current prices of spare parts, special tools, etc., necessary for the proper and continuing functioning of the Goods for a period of five years, following commencement of the use of the analyzer

(c) List of equipment available for providing calibration and routine preventive maintenance support as per manufacturer service/maintenance manual is to be provided and

(d) a clause-by-clause compliance statement on the Purchaser's Technical Specifications demonstrating substantial responsiveness of the equipment and services to those specifications, or a statement of deviations and exceptions to the provisions of the Technical Specifications.

(e) For HPLC Furan Analyzer, in addition to the above, Calibration should consist of developing a calibration curve for each furanic compound, development of extraction efficiencies for each extracted furanic compound, and daily single-point calibration of equipment.

8. SOFTWARE REQUIREMENTS
Multitasking software for full control of GC analyzer, with real time chromatographic data acquisition, data handling and post-run analysis, designed to operate with Windows Operating system on industry standard PC. If there is any up-gradation of software with in the period of warranty then the same should be provided free of cost by the supplier/manufacturer. Branded PC with latest configuration and laser color printer are to be supplied from factory along with the system directly. UPS of suitable rating with voltage regulation, spike protection and minimum 60 minutes back up (supporting the entire system for at least one hour) is to be provided. The software must fully control the instrument using pre-stored methods of all operating parameters.

System start-stop must be fully automated and controlled via the software.
• GC and all its modules (GC, methanizer, HS, Auto injector/sampler, etc.) should be controllable through single software.

• UHPLC and all its modules should be controllable through single software.