SUPPLYING AND COMMISSIONING OF TRANSFORMER OIL ANALYZERS: DISSOLVED GAS, FURAN & PASSIVATION CONTENTS (Electricity Transmission Directorate)
6. INSTALLATION AND COMMISSIONING
i. GC - TRANSFORMER OIL GAS ANALYZER
The Power input for the GC should be single phase, 220-240VAC, 50 Hz supply. The Tenderer has to state in detail the following requirements: floor Space, head room, foundation needed and the air-conditioned environment needed to house the system and to run the tests (pre-installation facilities required to be mentioned clearly in the Technical Bid to ensure proper commissioning). The supplier has to oversee overall systems integration, site preparation, installation and necessary configuration of the system.
The following list of items is to be provided along with the equipment:
1. All the necessary calibrants , calibration standards & calibration kits for GC.
2. Required consumables for installation of instrument.
3. Other materials required for installation and operation of instrument.
4. All the required gas cylinders with dual stage regulators.
5. Complete gas purification system for all the required gases.
6. Consumables for 5 operation years to be included mentioning the list of items and the prices of all individual items/components must be quoted.
7. All Items listed (1 to 6) must have clearly mentioned date of production and validity. All items must be from latest production batch and validity must cover expected using period.
8. All items must be packed in proper method suitable for long storage.
The system should be an integrated system Bundle & software and should come with Factory tuned with Application Guarantee. Proper commissioning must be carried out in ETD laboratory, Trial tests should be carried out and the test results from the trial tests should be reproducible with the reported results in the literature/accepted values. Any deviation beyond allowable tolerance not acceptable.